Risks removed.
The Problem
- A high risk handling activity had been identified at the customer’s depot where engineers have to invert traction packs before fitting.
Solution
- SET designed and manufactured a turning rig.
- SET specifi ed and had produced a set of customised packing cases that ensured that equipment arrived at the depot the correct way up for their processes.
RESULT
- The risk due to turning the equipment on-site was removed.